Main Article Content
Abstract
DFM technique can be applied throughout the development process, but if it aims to get big profits, DFM must be able to be applied in the concept of developing and developing prototypes from the design and development process. One DFM analysis on semi-automatic soy milk filtering equipment can find out the results of semi-automatic soy milk filter analysis. This research method: planning 2D & 3D design tools, producing, assembling & testing tools, arranging and calculating the influence of Design For Manufacturing (DFM) includes assembly time, component costs and production costs. Making semi-automatic soy milk filtering equipment requires a time of 5,300 minutes from 5 main components. The assembly of semi automatic soy milk filter equipment takes 22.45 minutes and in the supporting components and component costs Rp. 3,425,000; - and production costs Rp.85,824, assembly time based on DFM analysis produces 40% efficiency.